Wednesday, December 8, 2010

SID 23112.08

BLACK LEGION STATIONS 02V1 & 16K2
BL7 AGT GRAYSHIFT SEVEN
PERSONNEL AUDIT LOG PAL-ASCT2


SUBJECT ARMIN SHALE, CT2


Standard audit initiated SID 23108.15 following protocols IPAP-201 and IPAP-307 and in accordance with Imperial Memorandum IPA-DOC 1.01: So You'd To Audit Your Support Personnel. Audit record follows.


-SID 23108.19 Gunstar Vengeance. Personnel Audit, Section #1: Observation Period A.


Subject Armin Shale, human male from Redchili City, Anbarium Prefecture, Kasmakani III. Birthdate SID 20110.22. Height 1.9 meters, weight 82 kilograms. Brown hair, balding. Unmarried, unattached. Jessegaronic by birth (Western Synod, reformed), but no longer practices the faith. Severely myopic, but allergic to retinox 5, so must wear corrective lenses (spectacles, Imperial-issue, tortoise-shell browlines). During off-hours enjoys classical music (Air Supply, Night Ranger, Mr. Mister), literature of the scintilli-nosferatic school, and Kismiti cuisine.

Survey of IPE-Ts from previous 5 duty cycles finds that subject scores well within the blue echelon for the following evaluation categories: Knowledge, General Competence, Handwriting, Cleanliness/Neatness, but also finds that subject scores in the lower reaches of the taupe echelon for the categories of Teamwork and Spirit. Further observation of subject will be required in order to locate the source of this chromatic dissonance in subject's CRE chart.

---------------------------------------------------------------------------------------------

-SID 23109.10 Gunstar Vengeance. Personnel Audit, Section #2: Stress Testing A.

Item IPA-STEC.4 Environmental Control Adjustment Module TKU98 introduced to the EC system for subject's cabin. As a result of installation of ECAM unit, actual control of temperature and humidity levels in cabin was passed to IL station 02V1. Over subsequent 14 hour period, constituting the entirety of subject's off-shift, temp was increased in cabin by 14 deg Celsius and humidity was increased by 19%. Subject first noticed temperature and humidity changes at 24:17, spent subsequent 6 hours attempting to determine cause for these "spontaneous" environmental changes. Subject stress levels monitored by station 02V1 during this period. Subject managed to bypass ECAM unit at 05:19. Subject then slept until 06:45. Subject arrived at work assignment at 07:45, 15 minutes late. Stress Test A result metrics collected, compiled, published, and distributed as directed by Imperial Personnel Audit Protocols IPAP-201, IPAP-202, and IPAP-307.


No comments:

Post a Comment